Vertical Building - Copper Factory

Here I will demonstrate how to build vertically for a copper node making copper products.

Vertical Build Part 1 - Bottom Floor Roof Height

Here I will demonstrate how to build vertically for a copper node making copper products. The first step is determining the height of the bottom floor.

 


Vertical Build Part 2 - Connect Miner To First Floor

Explaining how to connect the miner on the bottom floor to the first floor.

 


Vertical Build Part 3 - First Floor, Smelters, Fast Wall Building, Wall Power

On the first floor the smelters are built. Fast wall building is demonstrated and then Wall Power Connectors are used instead of power poles.

 


Vertical Build Part 4 - Second and Third Floor Planning

Planning how the copper ingots get to the second and third floors. The 1m foundations are great for the roof to separate floors.

 


Vertical Build Part 5 - Wire and Copper Sheet

Setting up the Wire and Copper Sheet constructors.

 


Vertical Build Part 6 - Fourth Floor Planning and Storage

A final level for cable will also be created and we will plan for this however before that the storage for wire, copper sheet and cable will be stored on the bottom floor.

 


Vertical Build Part 7 - Cable, Final Summary

Final floor building cable. A summary of the vertical build brings together the concepts used to allow easy expansion of the building when faster conveyor belts and faster miners become available.

 


Building With Scale

Here's some thoughts on how you can expand the vertical copper factory using an additional node.

 


Hyper Tubes

Here I show you how to use Hyper Tubes to scale vertical buildings.

 


Copper Factory Upgrade Plan

We need to scale up the copper factory as more copper wire is required.

 


Copper Factory Upgrade Finished

Explaining how the copper factory was upgraded.