Power Load Testing Tower

This tower is used for testing the stability of 24 Nuclear Reactors. Each train station consumes 50MW of constant power. Using the Satisfactory Calculator to duplicate a blueprint means it's somewhat easy to place 1200 train stations which will draw a static load of 60GW.

Power Load Testing Tower