Power Load Testing Tower
This tower is used for testing the stability of 24 Nuclear Reactors. Each train station consumes 50MW of constant power. Using the Satisfactory Calculator to duplicate a blueprint means it's somewhat easy to place 1200 train stations which will draw a static load of 60GW.
![Power Load Testing Tower](/data/gallery/4/1/9/0/c/83-75.jpg?v=1605729414)